GREEN FORT ENGINEERING COLLEGE
Details :-

H.O.D : Mrs. Nazimunnisa



2'nd Seminar Details and Dates :-

GREEN FORT ENGINEERING COLLEGE

Bandlaguda, Hyderabad-05.

DEPARTMENT OF CSE / IT

 

Guidelines for preparing B. Tech Project Report

1.      Record color should be bottle green with golden print on the front cover

2.      The Matter displayed as the first page in the IV B.Tech Project Report format should be printed on front cover.

ARRANGEMENT OF CONTENT

 

1.      Title Page

2.      Bonafide Certificate

3.      Declaration

4.      Acknowledgement

5.      Abstract

6.      List of Figures

7.      List of Tables

8.      Chapters

9.      References

FORMATTING:

 

1.      The spacing of lines should be one & half spacing

2.      The font size of the main text should be uniformly 12 points throughout the thesis – Times New Roman

3.      The left Margin & Right margin should be 1.25” and top and bottom margins should be 1-00”

4.      The font size of heading should be uniformly 16 points.- Times New Roman

5.      The font size of sub heading should be uniformly 14 points.- Times New Roman

GENERAL GUIDELINES:-

 

1.      The entire report should be free from grammatical and spelling mistakes

2.      The figures should be crystal clear with adequate lables and titles.

3.      The page should be numbered from the first unit of the chapter

4.      The pages before the first chapter should be numbered in small roman numbers

Note:-  Before preparing the hard binded report, the soft copy should be thoroughly verified by the concerned guides.

HOD (IT)                   HOD (CSE)                              P R I N C I P A L


                                 NOTICE                                  12-03-2011

 

All the students of IV B.TECH II SEM-CSE & IT branch are informed to note down the schedule for seminar-II of project work.

                  

BRANCH

DATE

TIME

CSE-A

26-03-2011

10:00 AM

CSE-B

24-03-2011

10:00 AM

IT

23-03-2011

10:00 AM

Students are informed to note down the following points:

Ø  All the students should be present in the college sharp at 10:00 am on the scheduled date with their project group members.

Ø  The student is supposed to demonstrate the complete execution of the project and also show the final documentation (soft copy) of the report.

Ø  The documentation should be strictly according to the format displayed on the notice board and should be verified with the concerned internal guide before the seminar date.

Ø  After the report is thoroughly verified by the respective internal guide, the student should submit the hard binded report (bottle green cover) within three days after their seminar-II is over and also two CDS (each consisting of documentation report + execution code + seminar-I PPTS)

 

The number of hard copies = no of students in team (each student should prepare Individual copy) + 1(common copy should be submitted)

 

 

 

 

                                                                                                      HOD(IT)            HOD(CSE)      

                                                        

Picture
Picture

    Title Text.